Projects

Project Highlight #7

Client: Confidential
Location: Ohio
Duration: 12 months
Description: This year-long project had a contract value around $2 million dollars and necessitated multiple remediation technologies. Our in-situ treatment and clean-up objectives required U.S. Department of Energy evaluation, and involved the removal of volatile organic compounds (VOCs) in heavy clay soils by vapor-stripping (ambient air and hot-air injection), peroxidation, and grout injection. We used a track-mounted crane with a hollow-stemmed Kelly bar fixed to a proprietary auger to install overlapping soil-treatment columns. This yielded an effective mixing diameter of 3-14 ft., with treatment to depths exceeding 100 ft. The D.O.E. concluded our successful treatment was cost-effective and provided a reduction of 85 percent of VOCs.

Representative Projects – U.S. Department of Energy

  • #1, Savannah River Site (Aiken, SC)
  • #2, Savannah River Site (Aiken, SC)
  • Portsmouth Gaseous Diffusion (Portsmouth OH)
  • Weldon Springs (Weldon Springs, MO)
  • Representative Projects – USACE
  • Deer Island, (Boston MA)
  • Fort Benning (Columbus, GA)
  • Geiger Oil ( Charleston, SC)
  • Maxent Lagoon, 7.5-mile earthen levee (New Orleans, LA)
  • Nutt Island, (Boston MA)
  • Stoller Chemical (Charleston, SC)
Contact Us

P.O. BOX 50960
AMARILLO, TEXAS 79159-0960
PHONE: 806-352-0037