Projects

Project Highlight #4

Client: Confidential (Oil Producer)
Location: Illinois
Duration: 4 months
Description: Due to pending regulatory changes, an Illinois oil producer had an expedited schedule to close 4 ponds containing 250,000 cubic yards of petroleum sludge containing PNA’s and NORM. Slurried reagents were utilized to minimize the potential airborne impact of treating materials containing up to 600 pCi/gram of radium. Requisite air and personnel monitoring techniques were required. Breathing zone and air sampling was performed in areas where NORM residuals or contaminated soil was being disturbed. In addition, site boundary sampling was performed to determine background air concentrations prior to any excavation or consolidation activities being undertaken. The project was completed in the required 4 months utilizing 50,000 tons of solidification/stabilization reagent and specially designed reagent slurry mixing and pumping equipment.

Representative Client List – Oil and Gas Production and Refining

  • ChevronTexaco
  • Marathon
  • Exxon
  • Ashland
  • BP Amoco
  • ConocoPhillips
  • Kerr McGee
  • Motiva
  • TOTAL
  • Ashland Chemical
  • TOTAL Pertochemical
  • Shell Oil
  • Valero
Contact Us

P.O. BOX 50960
AMARILLO, TEXAS 79159-0960
PHONE: 806-352-0037